We started working at this barge terminal about 12 years ago when we installed a truck scale. Since that time we have been back to this location 3-5 times a year to work on other projects. This particular picture is of one section of a 250′ long 18′ thick slab that we poured. The slab is for an enormous equilibrium crane that unloads the barges below. To help understand the size of this crane… each scoop it takes from the barges is 10 cubic yards.